Search
  • Classic - Proto Fab Inc Mix Photo
    Second wall installed and welded waiting for next hopper to be installed. Day 2 Install
  • Classic - Proto Fab Inc Mix Photo
    Picture of the first wall attached to the hopper with wall 2 installed and welded today. Day 2 Install
  • Classic - Proto Fab Inc Mix Photo
    Me welding FCAW .045 wire Vertical Up. Day 2 Install
  • Classic - Proto Fab Inc Mix Photo
    Gabe goofing around. Day 2 Install
  • Classic - Proto Fab Inc Mix Photo
    Added the second hopper. Day 3.
  • Classic - Proto Fab Inc Mix Photo
    raising the third wall. Day 3.
  • Classic - Proto Fab Inc Mix Photo
    Adding legs to Hopper #2. Day 2 Install
  • Classic - Proto Fab Inc Mix Photo
    Just a look inside one of the hoppers. Day 3
  • Classic - Proto Fab Inc Mix Photo
    Bad picture. Day 2 install
  • Classic - Proto Fab Inc Mix Photo
    One long week in Lovelock, NV. Completed 74 hours for the week. Night shifts.
  • Classic - Proto Fab Inc Mix Photo
    First wall to be installed at Trex in Fernley. Day 1 install
  • Classic - Proto Fab Inc Mix Photo
    More of our project.
  • Classic - Proto Fab Inc Mix Photo
    Chuck and I welded all night at the top of this platform with 7018 Stick. Platform is about 100+ feet in the air.
  • Classic - Proto Fab Inc Mix Photo
    Not bad welds for 30 MPH winds. Day 2 Install
  • Classic - Proto Fab Inc Mix Photo
    Me under the hood in a very tight spot. Day 2 Install.