Search
  • Classic - 2008 - DBS The Renovation Mix Photo
    STEP 1- redoing layer of concrete on walls and 4" thick layer on FLOOR- hand mixed!- back breaking
  • Classic - 2008 - DBS The Renovation Mix Photo
    Step 2 - waterproofing paint 21ft of wall space(DRY LOCK) and completely new framing studs - notice the AC was removed and a window put in-
  • Classic - 2008 - DBS The Renovation Mix Photo
    STEP 2 - Same thing here - new waterproofing and stud framing
  • Classic - My Photos Mix Photo
    DBS - 2007
  • Classic - 2008 - DBS The Renovation Mix Photo
    This side was redone also- new concrete on walls, waterproof cement paint, moisture resistant walls and insulated, with moisture barrier -
  • Classic - 2008 - DBS The Renovation Mix Photo
    Step 1- redoing layer of concrete on walls -hand mixed! - and 4" think layer on FLOOR to meet old floor to wall 6" lengthand 21 fe
  • Classic - 2008 - DBS The Renovation Mix Photo
    The Beginning - Right after the initial Complete TEAR DOWN demolition!
  • Classic - 2008 - DBS The Renovation Mix Photo
    Added 6" insulation - Stuff will make ya itch!--LOL
  • Classic - 2008 - DBS The Renovation Mix Photo
    Done insulation and plastic moisture barrier
  • Classic - 2008 - DBS The Renovation Mix Photo
    all sheetrock done and NEW vocal booth started
  • Classic - 2008 - DBS The Renovation Mix Photo
    The BEGINNING- DBS Pro - 2007 Model - TOTALLY Detroyed and turned into THIS-
  • Classic - 2008 - DBS The Renovation Mix Photo
    Umm Yes that is the outside - a 6 foot deep x 3 feet wide trench had to be dug and recement the out side walls & waterproof!!!! - WTF(yeah)
  • Classic - 2008 - DBS The Renovation Mix Photo
    The old AC---YUCK
  • Classic - My Photos Mix Photo
  • Classic - My Photos Mix Photo
More
Close

Press esc to close.
Close
Press esc to close.
Close

Connecting to your webcam.

You may be prompted by your browser for permission.